what"s the abbreviation for P.C.C? what"s the formula to
calculate 1m3 P.C.C consumption?
Answer Posted / ronak shah
i think you want to ingradient consumption.
then add 52% shrinkag (converting dry to wet volume)
consumption of cement= 1.52/(sum of propertion)= value
number of cement=value/0.0348.
sand=1.52/sum of proportion*value of sand proportion= value
in m3
same calculation for all ingradient.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the Strength of brick?
The concrete slump recommended for beams and slabs; is?
please briefly explain calculating or estimating steel quantity for a RCC column?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to calculate Volume of Wet cement concrete for a specific grade?
How will you Engage Labours on Site?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What are the advantages and disadvantages of using plastic and timber fenders?
What is quantity of cement and sand required for 2000sqft of tiling?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m