i have 4 jobs i want run 1job should run on 1node and 2job
runon 2node
and.... how to make it possible?

Answer Posted / subhash

Create 2 Configuration files.. 1 file with 1NODE and 2nd file
with 2NODE configuration.

Open the 1st job,
Go to the 'TOOLS'-->'Configurations' --> Select the 1NODE
configuration file from Drop down list.

Open the 2nd job,
Go to the 'TOOLS'-->'Configurations' --> Select the 2NODE
configuration file from Drop down list.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is developer responsibilities in UAT (user acceptance testing and Post implementation phase?

1855


Describe the main features of datastage?

836


How do you schedule or monitoring the job?

858


Name the third party tools that can be used in datastage?

823


create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2395


How do you run datastage job from the command line?

799


Difference between data warehousing and olap?

818


Can you highlight the main features of ibm infosphere information server?

871


I/p : F1 table have A,B,C,D,E and F2 table having C,E,V i need output 0utput1: ABD output2: V any one suggest me this

801


Explain usage analysis in datastage?

869


What all are the different way to run a job?

815


How to convert RGB Value to Hexadecimal values in datastage?

3673


What are routines in datastage? Enlist various types of routines.

848


What are the types of containers and how to create them?

739


what is flow of project?

1733