Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we are using perforted cable tray for control cable and
ladder tray for power cable

Answer Posted / rezvanian

Due to the high current flowing through the power cable
that warms the cable and its temperature rises so we use
ladder tray for power cable and the temperature of the
power cable can be exchanged with the surroundings.
We cant use ladder tray for control cables because the
control cables have high bending capability ( flexibility)
which is dropping belly ( belly bend downward ) and the
control cables temperature is always near the ambient
temperature and the perforated cable tray is suitable.

Is This Answer Correct ?    14 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi! i want to know about mpse exam.

2353


Explain about the leakage class of the control valves

2034


Describe the functions of the Operator Interface including the considerations related to alarming and display layout/configuration/layers.

2130


How to calibrate the flow transmitter

1653


Isometric drawings are generated during _________________ phase of a project

2125


centrifugal compressor interlock? Tell me the parameter at which compressor will trip

3233


What is difference between ESD and PLC please Explain me clearly.

4952


what is the input to be given in digital flow meter during the the calibration time?

2287


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

2035


how to measure draft pressure in transmitter pl. give its single line digram

2027


what diffrence b/w plc s7200,300,400

2118


What is the procedure of calibration of Load cell?

1961


we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?

2641


what are the definitions of input, output, command & signal according to instruments controlled by PLC using DCS System?

2167


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2166