How many different between estimated quantity and practical
work at site.
Answer Posted / ratheesh
overall 5%
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Spider cracks occur in beam bottom due to––
what is the weight of 6000 psi concrete in lb/cft?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
how to calculate rate analysys of 1:6 plastering 10 sq m
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What are your future hopes for this job?
The definition of national highway
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
procedure for preliminary selection of size of column of 5 storey building
why does the most of civil engg is not intersted to going for teaching field?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
Why the finite element method is lower bound solution?
RR masonry rate analysis
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks