How many different between estimated quantity and practical
work at site.
Answer Posted / ratheesh
overall 5%
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to calculate weight of 1.8 cum of aggregate
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is the formula to find the diagonal shape stirrups?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
How much quantity of cement,sand,stone used to build 1 cum of cc road??
How many types of slabs are there & how to design it?
in 100 cft = 1350 bricks in 100 cft = ? bloks
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is fineness modulus ? and its sieve # ?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Formula for calculating the volume of bulb in underreamed pile
In reclamation works what are the importance of geotextiles and sand?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What is the zero value in quantity surveying