Answer Posted / selvakumar.j
LBB- local breaker backup protection. after issued the trip command by the relay ,the breaker should be open . if breaker not operate after received trip command ,LBB protection will operated and trip the upstream or downstream breaker to protect the circuit.
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
what material is the electrical housing wire made of? is there any difference for the telephone lines?
What is the tests required for a 132 kV, 400 kV , 765 kV for a Circuit Breaker and Power Transformer before commissioning ?
What are the factors which influence the choice of specific magnetic and electric loadings of a synchronous machine?
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain
What are the necessary components of the feedback control system?
Define sensitivity?
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
WHY SEPARATELY EXCITED MACHINE NEEDS EXCITATION BY DC SUPPLY WHY NOT BY AC
What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
What is the form name of 'c' license, I want to download in web
How to Calculate The sag of OPGW in Transmission Line???