What is the ratio of materials used for M10, M15, M20 & M25
grades of concrete? Also specify the quantity of water used in
each grade & how to calculate it?
Answer Posted / ashis malakar
M 10=1:3:6
M 15=1:2:4
M 20=1:1.5:3
M 25=1:1:2
The quantity of water is calculated as 0.45 to 0.60 times of
weight of calculated cement.
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
what is raft foundation
Who name us Engineer & Why?
In reclamation works what are the importance of geotextiles and sand?
How do we calculate the power of centrifugal pump?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Why does the pressure increase under soil?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
if the nitrates more than 45mg/l in water lead to disease then what is it called
Please let me know what is the simplest way of Calculating Mix Designs
How to calculate quantity of plum masonry in 1:3:7
.5Ast
Define mirror?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
what is escalation?how it is done?