concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / ratheesh
If 7th day cube fail, we have to wait 28 day cube result.
Should be use skilled labours...then wont get any cube failure.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is horizon or horizontal mining?
how meny typs of renging rod?
what is the dimensions of river sand truck trailer or trolly ?
Advantage of Aluminum form work in terms of activities can be skip and cost too
How can i do RCC rate analysis?
What applicable rate of wct in bihar
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What should be the standard roof height like to be?
Are cruise ships built for the transatlantic run?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
What is Joule Brayton Cycle?
roll of DLC in road constructions
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what energized you to complete your course?
how much cement sand n bricks required in im3?and how much in plaster?