Answer Posted / ratheesh
Questioner asked about plastering only not in mortar.
1. Plump pop checking,
2. Nylon rop 0r line dore checking,
3. Try square checking and
4. Water tube level or mercury levelling..
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is the minimum cement content for M20 & M25 as per is code -456(2000).
which method is used in semi-rigid connection design??
how to calculate the scour depth
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
Form where IS456 is adopted in 1978?
What is pre-stressed concrete?
What is Grid floor and mention its advantages ?
How do you calculate the power of a centrifugal pump?
What is the significance of cost estimate knowledge for an architect?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
what is the price of a cubic meter of concrete on international market?
How to calculate chejja reinforcement
what is Bearing Capacity,How to determine it?
what are the ffactors you considered choosing the course?