Answer Posted / awadhesh kumar sharma
600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
3. What are the disadvantages of your present job, things you do not like about it?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
During reclamation how can the occurrence of mud waves can be rectified?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what are the ffactors you considered choosing the course?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What is meant by a context menu in a cad software?
How do you calculate reinforcement weight of steel?
afe or not
How many feet are in 4 square yards?
how to calculate total cost for slab 35'×8'
What are the benefits of rcc pipes over steel designed pipes?
What materials were used to build the golden gate bridge?
how to calculate number of bitumen for road asphalt
What is the zero value in quantity surveying