Answer Posted / awadhesh kumar sharma
600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
what are the five benefits of using standard terminology in the measurement process?
Time required for curing of wall tiles before fixing
1:4:8 pcc calculation 591 cu.ft
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
Slump Values for works?
What is Gsb tollens ?
give me the rate analysis for Bituminous Macadam and SDBC
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How many kilo-newtons equals 1000 kilogram?
what is differences between ferrock and concrete ?
How to calculate canal slope curvature qty!
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
difference between fc and fc'?
construction workers how much time take one work or qty