where you provide overlap on column?

Answer Posted / awadhesh kumar sharma

600MM ABOVE FLOOR LEVEL AND 600MM BELOW BEAM LEVEL THATS MEANS WHEN CLEAR LENTH OF COLUMN IS 3M THEN LAP ZONE IS 3-.6-.6=1.8

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why is the statue of liberty made of copper?

656


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1523


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

1611


Ratio for 4500 psi concrete

1182


In cement making,what is meaning of blend,fineness,density. 

2984






hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

1824


for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1413


What are the applications of the modulus of elasticity?

665


what is your role of in previous company as a construction manager

1574


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1833


Formula of area of crane hook

1527


how many BSCs can i connect to the HUAWEI MSC

1842


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1224


What is the method of soil replacement test?

1547


if the nitrates more than 45mg/l in water lead to disease then what is it called

2346