Concrete Mix designs for M15,M20,M25,M30 and M35
Answer Posted / izhar ahmed
Mix design depends on the trail mixes in the water content
and water cement ratio is determined
to get the particular design strength of concrete in 28
days. Water Content controls the Strength of Concrete, In
general By Reducing The Quantity of Water we Get More
Strength of the concrete. The Desidn Mix Also Depends on
other factors such as Moisture Content of Materials,
Acidity of Water, Salt content In the water etc.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Define angular dimension?
what is the difference between np2 and np3 concrete mix
at which depth the construction of tunnel is economical from cost and engineering aspect.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
plz.show development and anchorage length in simple diagram.
how to convert cement, sand aggregate quantity from M3 to kg with full description?
how can we calculate steel value, depending on load
How many days should curing of plastering, brick work and concrete
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
Define What is the tallest man made structure in the world?
What is Critical path in Ms-Project ?
how many spacers we need for 1 ton reinforcement? aprox.
How to find permissible diagonal tensile stress in reinforced brick work