Answer Posted / imran
10.5n/mm2
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
sir please send me campus placement questions in civil engineering
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
How much cum. Brick work can do by 1 madon
What is hybrid foundation?
What are the advantages of cad software?
How to do rate analysis for concrete work including shuttering work?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
How to take labor charges for construction of 1cum of concrete?
how much used soil in 1 brick of standard size?
Define angular dimension?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How to calculate plastering for elevated water storage tank
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?