Which of the following statements about billing are correct?
a)Invoice dates for creating invoices at certain dates are
maintained in calender
b)You can not carryout pricing again during billing
c) a transaction specific requirement such as " deliveries
must be combine in a collective invoice" can be set to
control billing
d)If there are several payers for one delivery, only one
billing document is created for each payer.
Answer Posted / sankar
Answers are "a", "c" and "d" options only
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
What is product hierchey and where you assign in material master?
Name the influencing factors for pricing procedure determination during sales order entry?
Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.
What exactly is automatic posting can you explain?
How can a customer can connect his SAP ECC system to his SAP CRM system
In Enterprise Structure, we maintain Language and Currency for various fields,, what is the diff e.g we have at Company level, CCA, Company Code, Sales Org etc...
Who defines the account groups and give some tables in sap sd for customer master?
Tax jurisdiction processing is a close link between which two modules?
Define condition types?
Tell me your Current client's organization structure in relation to SAP SD in your project? Draw / illustrate with a diagram.I have been asked this question in an recent interview. Please reply asap... Eagerly awaiting for your response? Thanks in advance.
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
What is document type?
What is product attributes?
What is the integrated areas in sd and fi, sd and mm, sd and pp in both implementation and support projects?