Answer Posted / danny archer
we can view the log of a job in datastage director. for
example you are in datastge designer window and you are
running the job. Now goto tools menu and click "run
director". Now you can see datastage director, click the
log button on the tool bar. Here you could view log of your
job.
| Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
How do you remove duplicate values in datastage?
1.new record it will insert but changes of natural key is not present in taget i want to update (here key is composite natural key )can any one help this to explan how to do
What are the job parameters?
What is a quality stage in datastage tool?
Is possible to create skid in dim,fact tables?
In Datastage, how you can fix the truncated data error?
What are the main features of datastage?
Explain connectivity between datastage with datasources?
How many types of hash files are there?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
What is the difference between odbc and drs stage?
What is the difference between datastage and datastage tx?
What is the Environment Variable need to Set to TRIM in Project Level?(In transfermer, we TRIM function but I need to impliment this project level using Environment variable)
What are system variables and sequencers in datastage
Can anyone tell me a difficult situation who have handled while creating Datastage jobs?