Answer Posted / karuppaiah
M10,M15,M20,M25,M30,M40
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What are the problems one might face while having a Cantilever balcony?
what is the difference between prime coat and tack coat in road construction
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
How to check slab shuttering level.? Or check list for slab ?
what is meant by residual strain?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how to compute slab reinforcements on step by step procedures??
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
how many digree of freedom in four bar chain