Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Where are u provide laps in columns & beams?

Answer Posted / ratheesh

Column - Mid of the span u can lap, Min 50% rods only lap in
a floor.
Beam - should be lap in one, third of length. don't lap in
mid span....

Is This Answer Correct ?    26 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by csr in foundation? what is sbc?what is meant by contour line?

2391


What is hybrid foundation?

1132


five requirements of infill panels for walls?

3740


i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard

2354


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

2441


What are the steps involved in the concreting process?

1354


How many kilo-newtons equals 1000 kilogram?

1152


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2095


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2241


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

2086


A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?

1255


according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1784


What is construction mitigation management?

2335


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2597


any book or article on pumped concrete.

2212