Answer Posted / ratheesh
Clear cover for
Column - 40mm
Beam - 30mm
Slab - 20mm
| Is This Answer Correct ? | 5 Yes | 6 No |
Post New Answer View All Answers
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
pls mail some more tecnical qustions at msaranya2610@gmail.com
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how to nfind out the specific gravity of sand.aggregate,water please help...
How can we demolish concrete beams?
The foundations are placed below ground level, to increase?
how to estimate material requirement for an area of house in square feet?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
what discoveries did you have in relation to your course?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?