why we are condecting the slump test for concrete?
Answer Posted / bong mejia
read ASTM 143.
you will know all the answer.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
When was the first motorway built in england?
How will be cutting in timber plate size 600*400 column size
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Cement consumption of one cubic meter of aerocon blocks masonry?
what is modular brick and it size
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
Are cruise ships built for the transatlantic run?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Define current ucs?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?