Answer Posted / m.senthilkumar
actual deshuttering time 48hours
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
how to calculate quantity of bricks in circular manhole with examples.
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How to plan a project
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
How can we convert weight batch to volume batch for m30 mix
What is the substitute of Mastic Asphalt?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
how to calculate total cost for slab 35'×8'
what is the basic difference between Coloumn & Shear Wall
what is labour consume factor in residential projects