Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how the calculatio is taken for shuttering in staircase.

Answer Posted / m.senthilkumar

1.(FLIGHT & LANDING) calculate each flight underside,landing
underside area.landing underside area is normal L*B,but
flight underside area calculate using formula (A*A +
B*B=C*C)=length of flight then L*B=AREA .
2.(WASTE SLAB) calculate waste slab side ex.waste slab
thickness0.150m
flight length 3.8m=(both sides)2*3.8*.15=1.14sq.m.
3.landing sides=l*h(l=3sides)
4.(STEP) ex.width of staircase=1.25m,riser=.15m,threader.3m
each flight13steps
each flight calculation=width=1.25*13=16.25sq.m
both sides =(0.15*.03*13)=0.585 sq.m
because((.15*.3)/2*2=0.15*.3)OK.

Is This Answer Correct ?    6 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between replacement of cement by groundnut shell ash

3206


IS code for grade of concrete for bamboo lintel????

2173


Moisture content calculation for diff mix ratio's ??

1763


crank types

2356


What Are The Different Type Of Slump Test Indications?

1231


what else we can add rather than admixture in concrete to reduce the cement quantity?

6198


What are the reasons for geotechnical site investigations in uganda?

1156


What are the methods of measurement? Describe it shortly

2252


What are the applications of cad?

1266


Why Vitrified tile are getting pop up.

1042


specifications of fe500 steel

3538


why is M30 grade Concrete use for Foothing & Column M50

3498


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2222


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2627


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5618