How many no of bars in a bundle of steel and kgs/bundle. 8
mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.
Answer Posted / mahesh akula
8 -15 no.s
10 -10 no.s
12 -7 no.s
16 -4 no.s
20 -2 no.s
25 -1 no
| Is This Answer Correct ? | 68 Yes | 45 No |
Post New Answer View All Answers
How long does it take concrete to harden?
what is hydrostatic paradox?
How to find permissible diagonal tensile stress in reinforced brick work
Define What is unit weight of normal concrete?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How to compute minimum number of columns required for a site from area of site?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Why are pull-out tests performed for soil nails?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
can i get hindi version of is codes based on civil engineering?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.