Answer Posted / yash kandari
O.C:- M10, M15, M20
S.C:- M25, M30, M35, M40, M45, M50
H.S.C:- M55, M60, M65, M70, M75, M80
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what are the changes in concrete pour height as per IS 456, 2009?
What are the Types Of DPC and its Thickness used?
what is thumb rule for calculating the size of ISMB required for a particular length of span
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is difference between code and standard and specification?
What is the origin of name railway sleepers?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
What goals do you have in your career?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
What is a projection line?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.