Answer Posted / manoj kumar bhola
THE CHEMICAL REACTION TAKES PLACE BETWEEN CEMENT AND WATER IS KNOWN AS HYDRATION OF CEMENT.
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
what post do you prefer to work in this company and why do you think you can serve better in such position?
Who name us Engineer & Why?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What Are The Different Type Of Slump Test Indications?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
When was the first motorway built in england?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What out turn civil works
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
The 4 main factors to start a construction project are––
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils