What is difference between FE-415 and FE-500???
Answer Posted / madhavan
Fe- 415
The yield stress is 415 N/Sq.mm
The yield stress is 500 N/Sq.mm
and other is rib spacing also differ
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why should pumping be not used in case of concreting works?
How many cement sand ballast in cc 1:4:8 40mm
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
give me the rate analysis for Bituminous Macadam and SDBC
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
how many cement used in single story residential building per sqft
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
undistributed samples are obtained by
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What is the compressive strength of fly ash bricks?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
what is the relation between pitch of steel and depth of slab?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
what is hydrostatic paradox?
what is the meaning of 40/20 src