what are the changes made in induction motor so that it act
as induction generator
Answer Posted / alex
a prime mover would be installed and drive the motor above it synchronous speed, it eventually turns to an inductive generator.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
1.what is meaning of curve into a mcb. 2.what is basic reason changing of curve
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
I am having dual speed motor of cromton greaves make of 3.7 KW -1400 rpm and 5 KW - 900 rpm. Please let me know groups and winding connction for rewinding purpose.
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
HOW WORK HEAT PLATE EXCHANGER
The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?
pls tell what are doing the three phase motor star and delta connetion with circuit diagram and control wiring .
how solar power plant energy meter multiplication factor
What are the basic & Majour problems in UPS ?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
what will happen if multimeter(selector switch at DC voltage) and terminal at current is connected to DC supply?
what is deffrence between squirral cage and wound rotor in IM?
What is PQA???Applications........