What can be done if requirements are changing continuously?
Answer Posted / robby
If client requirements are chaging continuously, then below
changes are expected.
1. Change in design document or new design document HLD &
LLD
2. Change in test case scenarios
3. Change in test cases
4. Developer needs to write the code as per the change.
5. Tester needs to write new test cases
6. Tester needs to test the change.
7. In agile, work done in iteration can be affected.
8. Involves more cost.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
hi friends i recently finished testing course in hyderabad.now am looking for a job in uk.i need help about the projects in interview point.can any one explain me abt banking project or credit card.like what are the problems faced in u r last project etc.
explain ur testing project? how can u nexplain . what should we explain ? i have not worked on any project?
My name is Akpos from Nigeria. I have finished manual testing course. Please, can someone advise me where to go on from here?
What is an exit criteria?
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
diff b/w desktop based testing & web application testing
On login window for username and password auto populated field means what !
What are parametere require for Performance testing?
when database testing comes into manual tesing
I have an UI issue "please fill out this field" pop up in firefox browser keeps scrolling with the page is it valid???
need testing projects where can i find them
is it not possible to automate full project??what r the parts in project that cant be automated(tht has to be done manually)?
What is Application Performance testing and Operational performance testing
What are the various techniques in white box testing?
what are metrics and what are metrics did u collect in you are project