How much overlapping required for welding the reinforcement
bars in Columns & beams
Answer Posted / er.subramaniyan
AS Per is code welding req.20dia of steel
doing welding in three point
1.starting point
2.middle point
3.end point
welding length 5cm
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How is calculate the cube molt
Why does the pressure increase under soil?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How many Sft of Level Plaster per Kg
How to calculate brick work quantity?? Block work quantity??
significance of specific surface area of particles?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
significance of specific surface area of particles?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Test procedure of fly ash bricks as per code ?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How to calculate carrying capacity of the existing water supply trunkmain