How much overlapping required for welding the reinforcement
bars in Columns & beams

Answer Posted / er.subramaniyan

AS Per is code welding req.20dia of steel
doing welding in three point
1.starting point
2.middle point
3.end point
welding length 5cm

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is calculate the cube molt

1788


Why does the pressure increase under soil?

651


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2234


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1555


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2188






How many Sft of Level Plaster per Kg

1123


How to calculate brick work quantity?? Block work quantity??

2112


significance of specific surface area of particles?

1636


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

2639


significance of specific surface area of particles?

1789


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

5815


Test procedure of fly ash bricks as per code ?

2125


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

2854


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1674


How to calculate carrying capacity of the existing water supply trunkmain

1803