Answer Posted / pravin
part of brick...at top side
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
how much cement sand n bricks required in im3?and how much in plaster?
Forces in a Shear Wall are in plane or out of plane ?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
types of laps in column
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
What are the materials used in building a gravity dam?
sir, whitch is the best book (writer name) for prepration of gate....
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What is an ortho mode?
calculate the quantity of water for 1:6 cement mortar
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?