What is mean by Standard Value, Scheduling Margin Key,
Production Version, Product Cost Collector, Control
Key,Demand Management.

Answer Posted / ajit kumar santi

1. STANDARD VALUE KEY--
Standard value is nothing but the dimension of the method result,So that the system can copy the calculated value into a standard value in the routing, the standard value must be defined using the standard value key in the work center.
6 std value makes a standard value key.

2.PRODUCTION VERSION--
you can create production version is MRP-4 views. it is used for which alternative bom will use in which operation in production.

3.PRODUCT COST COLLECTOR---
In REM process, the cost which are incured during manufacturing and posted to an element is called PCC. During the process of entering actual data such as- material cost and production cos, these are added to PCC.

4. SCHEDULING MARGIN KEY---
Schedule margin key Define Floats. floats is nothing but a time period. there are 4 types of float-
a) OPENING PERIOD- The period between Order creation date and order start date.
b) Float before Production-
The time period between order start date and production start date.
c) Float after production--
The time period between production finish date and order finish date.
d) Release Period--
The time period between Order finish date and scheduled finish date.

5.CONTROL KEY--
Control key determines which business transaction should be executed for the object that belongs to the task list or order. examples of Control key- PP01,PP02 etc. you can set control key in OPJ8
The parameters of OPJ8 are--
a)Scheduling
b)Auto goods Receipt
c)Print
d)Print Time tickets
e)Print Conformation
f)Cost
g)Determine Capacity Requirement
h)Rework

6. DEMAND MANAGEMENT---
Demand management is used to determine the requirement quantities and delivery dates for finiished product. to create a demand program, Demand management uses PIR & Customer requirement.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Tell some standard order types and what configure done for current project

1726


Integration between PP and MM Module.

1609


What is meant by payscale structure? How did you configure the payscale structure?

714


What is a ‘work center’ in pp?

704


Explain how can you create production order without routing and bom?

760






What are the ‘bom categories’ supported by sap?

797


What is 'capacity planning'?

697


What is it 41 used for?

708


what are the problems you faced in MRP?

1586


How system calculate the actual cost?

1424


Overlapping and splitting, where do you assign?

2127


define variable cost

823


Why work scheduling view is required for semi-finished and finished products?

819


What is the planning horizon?

826


Explain what is routing in sap pp?

858