What is mean by Standard Value, Scheduling Margin Key,
Production Version, Product Cost Collector, Control
Key,Demand Management.
Answer Posted / ajit kumar santi
1. STANDARD VALUE KEY--
Standard value is nothing but the dimension of the method result,So that the system can copy the calculated value into a standard value in the routing, the standard value must be defined using the standard value key in the work center.
6 std value makes a standard value key.
2.PRODUCTION VERSION--
you can create production version is MRP-4 views. it is used for which alternative bom will use in which operation in production.
3.PRODUCT COST COLLECTOR---
In REM process, the cost which are incured during manufacturing and posted to an element is called PCC. During the process of entering actual data such as- material cost and production cos, these are added to PCC.
4. SCHEDULING MARGIN KEY---
Schedule margin key Define Floats. floats is nothing but a time period. there are 4 types of float-
a) OPENING PERIOD- The period between Order creation date and order start date.
b) Float before Production-
The time period between order start date and production start date.
c) Float after production--
The time period between production finish date and order finish date.
d) Release Period--
The time period between Order finish date and scheduled finish date.
5.CONTROL KEY--
Control key determines which business transaction should be executed for the object that belongs to the task list or order. examples of Control key- PP01,PP02 etc. you can set control key in OPJ8
The parameters of OPJ8 are--
a)Scheduling
b)Auto goods Receipt
c)Print
d)Print Time tickets
e)Print Conformation
f)Cost
g)Determine Capacity Requirement
h)Rework
6. DEMAND MANAGEMENT---
Demand management is used to determine the requirement quantities and delivery dates for finiished product. to create a demand program, Demand management uses PIR & Customer requirement.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the data you give in S.O.P screen?
What is mrp list and what is the use of it?
What is phantom item & sub contracting
Difference between PP and PI.
Why is work scheduling required for semi finished and finished products?
what do you mean by planning time fence
Standard mrp steps
What is the use of t-code cs20 in bom?
What are all the settings done for configuring the integration of pp with fico?
What is opening period?
How system calculate the actual cost?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What do you mean by basic dates