Answer Posted / ajit kumar santi
GROUP BOM- After creation of BOM, when we again create a BOM for that material without a plant GROUP BOM is created. A group BOM is mainly Created in the design phase and then later assigned to one or more plants for production. group BOM is not exploded in MRP in production Order.
BOM GROUP- A BOM group is used to group together material BOMs that described one or several products. A group BOM can be-
a) All variants of a Variant BOM
b) All alternatives of a multiple BOM.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is meaning of customized reports?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Define stock requirement
What is primary cost and secondary cost?
How to move to the realization phase?
In the monthly lot size proc, how to generate lot at the end of Period?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Explain how to create prt master records?
List out the basic procedure for dispatching operations in capacity leveling?
After doing realization how we will check whether it is working or not?
What is the Difference between TECO and CLSD?
What is the use of data in work centers?
Explain 'mrp' (material requirements planning)?
Mention how mrp (material requirement planning) types are classified?
Integration between PP and QM Module.