How many percentage extra considering in PEB roof sheet ?
Answer Posted / prashanth
it depends on your height of the roof at the ridge & ends.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is an object snap mode?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is Rankine Cycle?
What does a construction cost covers and what does not?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
how to preaper for interview wat they asked in interview give me idea
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how to calculate spacing rod in column
what is the painting co efficient of slope roof tiles?
Technical Question of Civil Engineering
Soil bearing capacity formula
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
what is floating slab foundation?
How do we determine the specific gravity of a cement?