What is the Laplenth for Reinforcement for Verticl and
horizontal Structures as per IS code?
Answer Posted / ajay kumar
vertical M20- 47D
M25- 41D
Horriz M20- 50D
M25- 45D
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the use of extruded feature in solidsworks?
how to identify the failure of building by expansive soils
What difference comes in constructing of house and a housing complex like society
For fine aggregate which is most suitable River sand or crusher sand & why ?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Why should appointment store person for project ? what is the benefits for company ?
about higyway engineering
how gradation of aggregates effect on slump of fresh concrete?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is the use of mirror command?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
VAT and CST ? Which benefits for buyer ? Why benefits?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What are the different types of civil engineering?