y we need to take 28 days strength as compressive
strength ? y cant we take 30 th day
Answer Posted / sha
gud ravi
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How and where are aqueducts built?
i want texture painting pwd data
How to construct a water sump in a rocky soil?
For the construction project what capital cost has to be taken in consideration?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How can we convert weight batch to volume batch for m30 mix
what is project?
What is the meaning of a blue land surveyors flag?
what is relation between SPT N value and driving piles after conducting a soil test?
Did any of the egyptian pyramids ever fall down?
What are the responsibilities of a construction manager?
How much quantity water should be placed in one cubic meter area?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Who name us Engineer & Why?
what is flashing?