difference between limit state method and working stress in
terms of load
Answer Posted / dharma raj pant
limit state is non deterministic i.e. parameters are not
known initially whereas WSM is deterministic
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate unit weight of concrete for m40 grade.
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is the difference between undo & redo?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is the withdrawal force of steel nails?
what could be the production cost of 1 cum of concrete by CP30 plant
may i know the detailed description of cutting length
What is fineness modulus ? and its sieve # ?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
How many feet are in 4 square yards?
What is meant by engineering drawing?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
How do You Maintain a structure after getting cube test of low strength.