Answer Posted / paresh
it must be between 25 to 30 years . if work is being properly excuted.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
what is kribs is supporting?
What is progress payment?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What are the advantages of cad software’s?
Explain the difference between shear and tensile strength.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Rate analysis of Vitrified tile in cement mortor 1:3
What is Base Shear ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
reinforcement slab, beam and column formulas?
what discoveries did you have in relation to your course?
What is meant by cad?