Answer Posted / a.ramamoorthy
Design mix is calculated by Weight and Nominal mix is
Calculated by Volume
| Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
it is a corrected question." make a list of engineering property(properties) of soil.
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What applicable rate of wct in bihar
What is soil enforcement?
what is features of a typ-ical modern air-conditioning installation?
what is the calculation of raw material for 0.35cum of m-15
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
pls give me ans to ACT formula cube testing porpuse
Define line type?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
How can you produce desired alloys and discuss their applications in daily life.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
it is possiblee to produce concrete with out cracks...