why expansion bellow is provided in between hopper and vessel
in ash handling plant?
Answer Posted / randhir singh
To provide isolation from vibrators & to reduce thermal stress between hopper and vessel.
Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
How to calculate power press toneage
what is the basic use of power plant in equipment
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
operation
How do you consider that you can improve and what assistance do you need to achieve this
what is the meaning of SST300 V56A in SIEMENS turbine
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
what is the trip circuit supervision in an electrical meaning?
why airtel use + 24 volts and other operators use -48 volt
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is restricted earth fault explain in details
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
what is the difference between compensated & normal drum level in boiler drum?