If in a 3 phase supply if the load current is 200A what
value of current the each phase R,Y & B will carry?
Answer Posted / jaibir kadian
if phase current are balance than it is 200/3 each phase. if unbalanced than remaining current goes through neutral.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
What is Faraday's law
What is the disadventage of gland earthing(power cable) if any. ?
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
Why 30kw 40 hp 4 pole 3ph induction motor over heated?any steps on reduction in heat?
what is conductor constant of raccun conductor
What is the distance between each insulator in 33kv transformer and how can it calculate
why we cannot protect 100% winding of an alternator by using differential protection?
What happen in ups if phase reverse?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
Please brief what is sinewave
how can get electrical c licence.now i am working in spining mill , transformer capacity 2750KVA. SANCTION DEMAND 2250KVA. PLEASE ADVISE ME . MY CONTACT NO 09944226823
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
Is it posible to instal one more SMDB from the existing SMDB and is it practical.