Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why IBD Vent is kept at higher elevation than CBD ?

Answer Posted / vinoth

when water is converted into steam, huge quantity of
dissolved salts are residues of this conversion. They
normally settle down in the bottom of the Boiler drum. In
CBD, we continuously remove this dissolved salts otherwise
it will get carry over with steam and damage the blades of
turbine. Where as IBD is to remove Excess feed water which
crosses the Seperator level inside the boiler drum.so IBD is
to prevent carry over water with steam where CBD is to
prevent carry over of scales with steam.
with above description, we can easily predict why IBD is
in higher elevated than CBD.

Is This Answer Correct ?    20 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is LB-SR.

3063


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3309


can dp type level transmitter work in under vaccum condition

2025


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1044


why airtel use + 24 volts and other operators use -48 volt

2684


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1760


what is the basic use of power plant in equipment

1836


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1790


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1749


explain how the third harmonic content of the magnetising current affects transformer design

3327


procedure of how to generate power in solar plant.

2021


By any way can we increase the B check hours from 300 to 500

2250


How to calculate power press toneage

2127


what does mean by kva rating

1565


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2462