relation bet Coefficient consolidation Cv, time factor Tv,
drainage path d, & time t is
Cv=d2Tv/t
Cv=d2t/Tv
Cv=tTv/d2
Cv=Tv/td2
Answer Posted / nawal k dwivedi
Its first one i.e Cv=(Tv)(d^2)/t
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
what is castigliano theaorem
rimmer in pile foundation
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Which brick is best for construction ,either fly ash or AAC BLOCKS
What is an object snap mode?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
how to identify the failure of building by expansive soils
explain fie benefits of using standard terminology in the measurement process
Explain what is progress payment?
what r you reqired for concrete baching plant?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Basic questions of civil engineering
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How can explode a block?