relation bet Coefficient consolidation Cv, time factor Tv,
drainage path d, & time t is
Cv=d2Tv/t
Cv=d2t/Tv
Cv=tTv/d2
Cv=Tv/td2
Answer Posted / nawal k dwivedi
Its first one i.e Cv=(Tv)(d^2)/t
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
how much one carpenter can doing shuttering of slab in one day
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
acceptance criteria for concrete works
The 4 main factors to start a construction project are––
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How do you change a dimension value in solidsworks?
What is thumb rule for deep trench excavation
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is Short bored pile foundation.
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
How to calculate unit weight of concrete for m40 grade.