relation bet Coefficient consolidation Cv, time factor Tv,
drainage path d, & time t is
Cv=d2Tv/t
Cv=d2t/Tv
Cv=tTv/d2
Cv=Tv/td2
Answer Posted / nawal k dwivedi
Its first one i.e Cv=(Tv)(d^2)/t
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
What is aggregate?
pls tell me , what is the water content
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
how we calculate the vol.of wet concrete..?
How many mortar required for Brickwork of 1 Cu.m works??
In earth work 1300 cum soil how to calculate how many liters require in water
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to calculate the strength of rebound hammer test reading in building construction ?
What year was the keystone power plant in Indiana County constructed?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required