Answer Posted / santhosh
IS9527(Part 3):1983 ---Code of practice for design and construction of port and harbour structures: Part 3 Sheet pile walls
IS9527(Part 4):1980 --Code of practice for design and construction of port and harbour structures: Part 4 Cellular sheet pile structures
IS 2314:1986-- Specification for steel sheet piling sections (first revision)
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
Permissible wastage of cement as per IS code ? In which IS code I get it?
what is the construction cost for per cft of multistorryed building in kolkata?
construction workers how much time take one work or qty
What is portland cement
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how i can tak Quantity of mortar in block work
How we calculate the service time of buildings
When column of building is abutting the boundary line,then suitable footing advised is
How to design staircase.plz tell me formula for the design the staircase.
what is the difference between replacement of cement by groundnut shell ash
Which prize is the alternative to the NOVEL Prize?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required