what is the technical word for column and beam joint
Answer Posted / er.rahul hasan
Rigid joint....
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
(Project Management Topic) What are the important criteria in the successful realization of the project?
what is moment-curvature relationship in semi rigid connections??
How do we calculate absolute pressure?
what are the changes in concrete pour height as per IS 456, 2009?
what is the relation between pitch of steel and depth of slab?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
how to find hardness of water?why it should be determined?
How much time Required for PPR pipe network testing
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
what could be the production cost of 1 cum of concrete by CP30 plant
Permissible wastage of cement as per IS code ? In which IS code I get it?
Define Who designed the city of Washington DC?
Types of column foundation and how to calculate its steel quantity.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm