what is the % wastage of cement in rcc
Answer Posted / mehul
As per Codel Provision and CPWD Specification the % wastage
of cement is 2 to 3%
| Is This Answer Correct ? | 25 Yes | 3 No |
Post New Answer View All Answers
What is difference between limit state and working stress method? How it is applies in building structure.
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Define What is the origin of name Railway Sleepers?
what is difference between GTS bench mark and temporary bench mark
use ofr concrete as per grade ?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What are advancements in civil engineering?
what is diversion?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What is the exception critarea of cube?
how to calculate the scour depth
What is meant by cartesian coordinate system?
For what purpose bedding is used under storm water drains, explain?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Dear Sir What is the Contraction joint for base Slab