Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the minimum and maximum water cement ratio

Answer Posted / karan

minimum w/c ratio starts from as low as 0.23% but in this case "sometimes" all particles doesn't get hydrated.so 0.32-0.35 can be taken as minimum W/C ratio

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

3242


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1470


What is a hatch patterns?

1053


five requirements of infill panels for walls?

3672


What are the reasons for geotechnical site investigations in uganda?

1102


How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir

1482


Aptitude, reasoning, quants, verbal and technical question

1501


What is the Null Point of chimney in Power Plant

3682


what is anchorage length,lap length and (dont remember the last one)

2145


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

3557


What are the disadvantages while using stone dust as filler in pavements?

2437


can you give me the details of rate analysis of steel and concrete?

2924


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2222


how to calculate testing date

1644


In the roof of a pumping station explain briefly the components of a waterproofing system?

1112