what is the minimum and maximum water cement ratio
Post New Answer View All Answers
what are the challenges of being a team leader and a supervisor?
How to plan a project
What are the reasons for geotechnical site investigations in uganda?
psc girder detail
what is the design procedure for building
How can we demolish concrete beams?
Advantage of Aluminum form work in terms of activities can be skip and cost too
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
undistributed samples are obtained by
what is mean by c32/40s concrete class
what are the ffactors you considered choosing the course?
Define What is a projection line?
Which IS Code/American Code applied for coupler test of steel