what is the % wastage of cement in rcc

Answer Posted / praveen kumar

3%-5%

Is This Answer Correct ?    29 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the cost difference between site mix and ready mix concrete per cubic meter

1442


what is the mix design for M:60 with micro silica andmetakaoline?

1809


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1963


what is difference between GTS bench mark and temporary bench mark

3960


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2653






What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2239


Exterior Joints,define

1535


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1728


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1773


What is a bearing capacity of soil?

815


how is the reinforcement is distributed in triangular slab

1765


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

1788


Civil engineering material testing Standard results

1870


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1448


why we create short columns under grade slab?

1847