how many labour is required for 1cum of concrete?

Answer Posted / enayatullah mahroowal

0.36 skilled and 2 unskilled labour is enough form onc cum
concrete

Is This Answer Correct ?    23 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much material is required for constructing a 2 Lane 2Km rigid pavement road

1816


Explain the different types of roofing systems?

863


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1580


what is kribs is supporting?

1697


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

1908






How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6365


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1288


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

1876


How to calculate laplength for 3 floors

1430


Explain creep?

780


Define Workability ?

900


what is mc arther pile?

1883


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1988


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2490


What is Architect-Prepared Contract?

831