how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / devender singh
For M20 Grade concrete the nominal mix is 1:1.5:3.
taking bulkage factor as 1.54,
volume of cement=(1.54*1/5.5)=.28cubic metre=.28*1440=403.2kg=8.06 bags
volume of sand=(1.54*1.5/5.5)=.42 cubic metre=14.83 cft
volume of coarse aggregate=1.54*3/5.5=.84 cubic metre=29.66 cft.
Is This Answer Correct ? | 20 Yes | 7 No |
Post New Answer View All Answers
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
Describe the sections included in a typical bill of quantities
What is Joule Brayton Cycle?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
Which are the top apps for you civil engineer?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
Explain major difference between auto level and dumpy level?
How much does the leaning tower of pisa lean?
trapozidal