Answer Posted / k.prakashchandra
To build up a steady voltage (potential)between test points
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What are two contours of nichols chart?
What is an ac motor?
Why lose 1 phase voltage in 33kv to 415v stepdown transformer
how i calculate the syncrones generator NGR resistance .if we have a 6mw generator line voltage of generator 11kv also line current 393.3 ampere.
What is phenomenon of electromagnetic induction and how it works?
How to work definite,over pluxing,revers power,OSR relay
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
i want use the cable size 16cx4 core aluminium usege watts 240x2000w this cable size is correct?
briefly explain the main blocks found in a microprocessor based system
is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.
The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?
33kv substation lay out details & line to line & line to earth measurements
What is the maximum and minimum rating of UPS?
i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?