what is slope provided to lying the sewerage pipe of
different dia ?
Answer Posted / karunakaran
for 200mm dia the slope shallbe 1:120
150mm dia 1:90
100mm dia 1:60
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
what is the name of shuttering oil used in oman
How to build the floor to ceiling bookcase?
How to cal. The weight of hollow pipe?
what are the types of dimensioning?
What is meant by solid geometry?
what is the mix design for M:60 with micro silica andmetakaoline?
How much quantity of rod binding work by a rod binder per day
explain the advantages of total stasion
RR masonry rate analysis
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What are your goals?