if there is pf in two libraries and there is a logical file
based on the PF, how to find the pf on which the pf is based.

Answer Posted / aa

Use command DSPDBR on each PF qualified with the library name. The LF will be displayed in the PF to which it belongs.

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the types of identifiers?

579


can you debug ile rpg program using isdb?

748


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

782


what is the use of sflnxtchg?

820


can I touch the array during treatments?

767






1.Load an runtime array of length 99 from the pf and you want to handle all the possible errors?

2380


what is the difference between do while and do until?

720


What is the difference between iter and do?

685


Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On

2024


what do you mean by an input subfile, what are the keywords required?

785


What is file identifier where we can use?

658


How Chain operation copies the record's data to the input buffer for the program?

1094


what is program status data structure?

1404


how can I tell when to replace the array?

710


Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

727